* Calculation of income tax is [(429.01 – 60.06 – 4.29) x 0.15] – 32.18 = 22.52 ** For single individuals without children and may vary according to marital status and number of children. *** For premiums that are paid in due time, as an incentive, a five-point reduction is applied (down from 20.5% to 15.5%). Source: Ministry of Family, Labor and Social Services Valid for January 1, 2020 – December 31, 2020 USD 1 = TRY 6.86 as of July 1, 2020 |
Cost of Electricity | |||||||
Consumers Purchasing Electricity from Commissioned Supply Companies | |||||||
Distribution System Users | Capacity | Active Energy + Distribution | Reactive Energy | ||||
Capacity Charge | Over-Capacity Charge | Standard | Daytime | Peak | Nighttime | ||
TRYcent/kWh | TRYcent /kWh | TRYcent /kWh | TRYcent /kWh | TRYcent /kWh | TRYcent/kWh | TRYcent/kWh | |
Medium Voltage | |||||||
Double Term | |||||||
Industry | 308.4076 | 616.8152 | 58.3534 | 59.0259 | 91.1790 | 33.0753 | 30.2874 |
Single Term | |||||||
Industry | N/A | N/A | 59.1740 | 59.8467 | 91.9998 | 33.8960 | 30.2874 |
Low Voltage | |||||||
Single Term | |||||||
Industry | N/A | N/A | 65.6963 | 66.3688 | 98.5219 | 40.4182 | 30.2874 |
System Usage Tariffs for Consumers Purchasing Electricity from Private Suppliers* | |||||||
| Capacity | Distribution Tariff | Reactive Energy | ||||
Capacity Charge | Over-Capacity Charge | ||||||
TRYcent/kWh | TRYcent/kWh | TRYcent/kWh | TRYcent/kWh | ||||
Medium Voltage | |||||||
Double Term | |||||||
Industry | 308.4076 | 616.8152 | 9.2797 | 30.2874 | |||
Single Term | |||||||
Industry | N/A | N/A | 10.2502 | 30.2874 | |||
Low Voltage | |||||||
Single Term | |||||||
Industry | N/A | N/A | 15.8592 | 30.2874 | |||
Multiple tariff application for November-March period: 07.00-18.00 daytime; 18.00-22.00 peak; 22.00-07.00 nighttime. Multiple Tariff application for April-October period: 06.00-17.00 daytime, 17.00-22.00 peak; 22.00-06.00 nighttime. Capacity Charge: Monthly fixed-fee calculated per kW based on the “contract power” specified in connection contract and charged to double-term consumers connected to distribution system. Over-Capacity Charge: monthly fee calculated per kW for amount of power exceeding the “contracted power” specified in the connection contract and charged to double-term consumers connected to distribution system. Double-Term tariff: Tariff class charged for “distribution fee over the amount of active energy flow (kWh) received from the distribution system or given to the distribution system”, plus capacity-charge calculated per kW specified in the connection contract, plus over-capacity charge for the power (in kW) exceeding the “contract power.” Single-term Tariff: The tariff class charged for distribution fee only through the amount of active energy flow (kWh) received from the distribution system or given to the distribution system. *The active energy price is not reflected in the table, as the price is determined bilaterally between the consumer and the supplier. Electricity Bill Calculation: [(Consumption (kWh) x Active Energy Price* (TRYcent/kWh) x 1,02**) + (Consumption (kWh) x Distribution Tariff (TRYcent/kWh))] x 1.18*** Active Energy Price*: the consumers can either purchase electricity from the commissioned supply companies at the prices indicated in the table or at the prices determined bilaterally with the private electricity suppliers. **Funds (electricity fund 1%, electricity consumption tax 1%) ***VAT 0.18% Source: Energy Market Regulatory Authority (EMRA) |
Cost of Water for Industrial Use | |||||||
Reference Price USD/m3 | |||||||
Type of Customer | Water | Waste Water | Water VAT (%) | ||||
Industry | 1.76 | Included | 8 | ||||
Reference Price USD/m3 | |||||||
Organized Industrial Zones (OIZs) | Water | Water VAT (%) | Waste Water | Waste Water VAT (%) | |||
Eskişehir OIZ | 0.11 | 8 | 0.10 | 8 | |||
Antalya OIZ | 0.11 | 8 | - | - | |||
Source: Istanbul Water and Sewerage Administration (ISKI) Eskişehir Water and Sewerage Administration & Antalya Water and Sewerage Administration USD 1 = TRY 6.86 as of July 1, 2020 |
Cost of Natural Gas | |||||||
Gas Sales Tariff for Customers that have a Signed a Gas Sales Agreement with BOTAS | |||||||
TRY/kWh | TRY/Sm³ | ||||||
Less than 300,000 Sm³ | 0.11763647 | 1.251652 | |||||
OIZ | 0.12638816 | 1.393000 | |||||
More than 300,001 Sm³ | 0.13157895 | 1.40000 | |||||
Gas Bill Calculation: Consumption (Sm³) x (Tariff per Sm³ + 0.023 TRY* + Transport Tariff per Sm³**) x 1.18*** *0.023 TRY/Sm³: Special Consumption Tax **Transport Tariff/System Usage Tariff (see the websites of the relevant gas distribution companies) *** 0.18% VAT Source: Petroleum Pipeline Corporation (BOTAS) Excluding SCT and VAT |
Cost of Broadband Services | |
Fibernet and Hypernet | (USD/month) |
Download Speed (Mbps) – unlimited tariffs | Price |
Up to 24 | 13.84 |
Up to 35 | 16.02 |
Up to 50 | 20.39 |
Up to 100 | 21.85 |
Up to 1000 | 127.41 |
Metro Ethernet and G.SHDSL | Requirement specific |
Source: TTNET, Superonline All taxes included. USD 1 = TRY 6.86 as of July 1, 2020 |